Proton's 24% High-Rise Buyer Stat: The Business Case Your JMB Needs to See
- EvGuru

- 1 day ago
- 6 min read
Updated: 1 day ago
If your condo's management committee is still treating EV charging as a 'maybe in a few years' agenda item, Proton just handed you the data to change that conversation today. Proton reports that 24% of eMas 5 and eMas 7 PHEV buyers live in high-rise buildings, and the recommendation for any JMB, MC or property manager is simple: get an electrical load assessment and a written charging by-law in place now, before residents start installing chargers ad-hoc without approval.

The 60-Second Answer: The Demand Is Already Inside Your Building
Proton disclosed this figure at the line-off ceremony for the locally-assembled eMas 7 PHEV, stating that 24% of eMas 5 and eMas 7 PHEV buyers live in high-rise buildings (condominiums), which it says is higher than the national benchmark of 23%. In plain terms: nearly one in four Proton eMas buyers is a condo dweller, and the myth that EVs only work for landed homeowners is measurably wrong.
To respond to this, Proton says its charging partners cover over 600 high-rise charging locations nationwide, with special eMas owner rates as low as 63 sen per kWh. That's a public-network answer to condo charging. But it doesn't remove the case for private, in-building infrastructure your JMB controls directly.
Why the 24% Number Should Change Your JMB's Planning
A condo with 300 units, applying the national 23-24% benchmark loosely across all EV/PHEV-capable buyers (not just Proton owners), likely already has dozens of residents who own or are shopping for a plug-in vehicle. That's not a future planning problem. That's a current-year request queue your management office is probably already fielding one resident at a time.
Data point | Figure | Source |
Proton eMas buyers living in high-rises | 24% | Proton, via Paultan.org |
National high-rise buyer benchmark (Proton's cited figure) | 23% | Proton, via Paultan.org |
Charging partner network for condo/high-rise owners | 600+ locations nationwide | Paultan.org |
Special eMas owner public charging rate | From 63 sen/kWh | Paultan.org |
Separate Pro-Net condo charging rollout | 1,500+ charge points across 500+ condos | Proton e.MAS / AutoBuzz.my |
Public Charging Partner vs. Private In-Building Wallbox
Proton's 600-location network solves the 'can I charge at all' problem for condo residents. It does not solve the 'convenient, cheap, always-available charging at my own bay' problem that most owners actually want once they've lived with an EV or PHEV for a few months.
Factor | Public partner network (600+ locations) | Private wallbox at own bay |
Cost per kWh | From 63 sen (special partner rate) | TNB domestic tariff, no third-party markup |
Availability | Shared bay, may require booking or queueing | Dedicated bay, available anytime |
Who owns the equipment | Charge point operator (CPO) | Resident or JMB-managed asset |
Approval needed | None, pay-per-use | JMB written consent, ST-compliant installation |
Best fit for | Occasional or backup charging | Daily overnight charging, EV-as-primary-car households |
The JMB Approval Path, Step by Step
Suruhanjaya Tenaga's current EVCS guideline (GP/ST/No.54/2025) sets the electrical and safety framework every condo installation must follow, including mandatory Type B RCD protection against DC fault currents. A private AC charger up to 22kW for an owner's own bay doesn't need a separate charging licence, but it does need written JMB/MC consent and a licensed electrical worker's sign-off.
Step | What happens | Typical timeline |
1. Site assessment | Licensed electrician checks MDB capacity and cable route | 1-2 weeks |
2. JMB by-law or resolution | Committee approves a standard spec so future requests fast-track | Passed at AGM/EGM |
3. ST-compliant installation | Dedicated circuit, Type B RCD, correct cable sizing | 1-3 days on site |
4. Metering decision | Sub-meter per bay vs. shared meter with JMB-administered billing | Decided before install |
5. Commissioning | Final inspection, testing, handover documentation | Same week as install |
The one mistake to avoid: approving resident EV charger requests one by one, with no building-wide policy or standard spec. Ad-hoc installations on uncoordinated circuits overload the main distribution board, create inconsistent safety standards across bays, and leave the JMB exposed if something goes wrong on a resident-arranged install that was never properly assessed.
What This Means If You're a JMB Committee Member
A 24% high-rise buyer rate signals every 4-5 EV or PHEV sale in Malaysia now touches a condo, not just landed homes.
Waiting for a 'formal request' misses residents who are quietly using extension leads or unlicensed setups instead of asking.
A pre-approved by-law and installer panel turns each new request into a fast-track approval instead of a fresh committee debate.
EV charging readiness is increasingly a factor buyers and tenants screen for when comparing condos.
Shared infrastructure with sub-metering lets the JMB recover costs without subsidising individual residents' electricity.
What This Means If You're a Homeowner in a High-Rise
You don't need to wait for a public charger queue near your unit if your JMB approves a private bay installation.
Under Malaysia's strata rules, you can formally table an EV charger motion for your JMB's general meeting agenda.
A private wallbox charging on your own domestic tariff is typically cheaper per kWh over time than relying solely on public partner rates.
If your car uses a Type 1 connector, you'll need a Type 1-to-Type 2 adapter to use most Malaysian public and home charging equipment.
For landed homeowners, the calculation is simpler since there's no committee approval step. Our landed-home installation guide walks through single-phase vs three-phase supply, cable runs and what to expect on install day.
Commercial Car Parks and Corporate Buildings
The same 24% logic applies to office towers, shopping mall car parks and business parks: employees and visitors are already EV or PHEV owners in roughly the same proportion as the general buyer population. Commercial property owners who install shared charging now, while the Green Investment Tax Allowance (GITA) window remains open through 31 December 2026, can offset qualifying green technology capex against statutory income.
Our commercial and car park charging page covers scope, GITA eligibility basics and how a multi-bay project is typically scoped for offices, condos and corporates.
FAQ
How many EV owners are likely already living in my condo in Malaysia?
Based on Proton's disclosed figures, roughly 23-24% of new EV and PHEV buyers nationwide already live in high-rise buildings. Apply that rate to your building's parking allocation and unit count as a rough planning estimate, then confirm actual demand with a resident survey before your next AGM.
Does my JMB need Suruhanjaya Tenaga approval to allow EV chargers?
A private charger up to 22kW for an owner's own bay doesn't require a separate EVCS operating licence, but the installation itself must still follow Suruhanjaya Tenaga's electrical and safety rules, including Type B RCD protection, and needs written JMB or Management Corporation consent. Shared, communal or public-access chargers require Charge Point Operator registration and full EVCS licensing.
Is it cheaper to use Proton's public condo charging partners or install a private wallbox?
Public partner rates from 63 sen per kWh are competitive for occasional or backup charging, but a private wallbox billed on your own domestic TNB tariff generally works out cheaper for daily, high-mileage charging with no third-party markup. The right choice depends on how often you drive and whether your JMB has approved a private-bay pathway.
Can a JMB reject a resident's request to install an EV charger?
A JMB can set reasonable technical and safety conditions, such as requiring a licensed electrician's assessment and standard equipment specifications, but an outright blanket ban without valid justification is difficult to sustain. The safer and faster route for both sides is a pre-approved building-wide by-law rather than case-by-case rejections.
What charger size is best for a shared condo car park?
Most condo bays are well served by 7.4kW-22kW smart AC wallboxes rather than DC fast chargers, since overnight charging speed is rarely the constraint in a residential setting. Our Guru Swift Advance covers this exact range and includes smart load management, which matters when multiple bays share one distribution board.
Sources & Assumptions
Proton buyer demographic data (24% high-rise, 23% national benchmark) and the 600+ location, 63 sen/kWh partner network figures are from Proton's presentation at the eMas 7 PHEV CKD line-off ceremony, as reported by Paultan.org (July 2026).
The separate Pro-Net condo charging expansion (1,500+ points, 500+ condos, RM0.63/kWh rate valid until 31 December 2026) is from Proton e.MAS's official announcement and AutoBuzz.my (June 2026).
Suruhanjaya Tenaga's current EVCS safety framework and Type B RCD requirement are referenced per ST's GP/ST/No.54/2025 guideline.
GITA figures assume the current framework as confirmed through 31 December 2026; commercial readers should verify current eligibility with MIDA/MGTC before committing capex.
TNB domestic tariff comparisons are illustrative only; exact per-kWh cost depends on your account's tariff tier and should be confirmed against your latest TNB bill.
All EVGuru pricing referenced elsewhere on this site follows our standard from RM1,590 (single-phase) and from RM1,650 (three-phase) installation rates; condo and commercial projects are quoted per site.
If your JMB, MC or property management team wants to get ahead of this demand curve rather than react to it one resident at a time, EVGuru can run a free site assessment, present a ready-to-approve charging plan at your next committee meeting, and handle the licensed installation end to end. Browse our condo and JMB charging page or our installation portfolio, then request your quote to start the conversation.



