top of page

停车场和企业 的电动汽车充电解决方案

为马来西亚购物中心、办公大楼、公寓的所有停车场提供智能、灵活和可靠的解决方案

At a glance


Timeline
Confirmed after site assessment

Funding
Purchase or site-specific partnership

Requirements
Reviewed for your site

Billing
App or RFID options

THE BASICS

How condo charging works

Who pays

The building can purchase the chargers or discuss a partnership. Funding and revenue-sharing options depend on site suitability and agreed commercial terms.

Who has access

The property decides, and sees revenue and power usage in the CMS.

How residents pay

Monthly subscription or per-use charges set by the property, via the EvGuru app or RFID card.

Power

Dynamic load management lets several chargers share the building's supply; a phased 7kW plus load-management path stays within existing headroom where possible.

Residences we've equipped

Explore examples of EvGuru charging installations at residential properties. We can discuss a relevant installation and the options for your building during a site assessment.

Rimbun @ Embassy Row

Shared condo EV charging, profit share.

Two shared EvGuru charging bays for residents.

e6d781_a670c26461194a31a2b4d97720fc4f5b~mv2.jpg
e6d781_968082207ea1406e9f50f33fbecd9ae7~mv2.jpg

Four Seasons Residence, KLCC

Residential EV charging.

2 × 22kW chargers.

Surian Condo, Petaling Jaya

Condo EV charging.

2 × 22kW chargers.

专为停车场、公寓和购物中心设计的充电解决方案

无论您的物业是否已分配、未分配或访客停车,EvGuru 灵活的解决方案都能让您轻松提供 EV 充电。

Shared chargers for the building

Shared bays for residents or visitors, with access and billing agreed by management. EvGuru reviews site suitability and the approvals needed for the proposed operating model.

Private charger, own bay

A charger for a resident’s own bay starts with management consent and a site assessment. Electrical capacity, cable routing and applicable requirements are checked before installation.

What your building manager will ask for

Charger and load

Charger type and load; single-line diagram.

Building supply

Riser / transformer load study; cable route and trunking.

Billing and safety

Metering or billing method; RCD Type B protection.

Cover and credentials

Insurance and indemnity; ST-certified installer credentials.

EV GURU如何为社区充电服务

1. JMB decision

Committee resolution and an EV by-law. We provide a one-page board paper and a draft by-law.

2. Feasibility pack

Credentials, single-line diagram, load study, insurance, plus a free 15-minute committee briefing.

3. Site survey

Joint walk with the building’s M&E team: DB capacity, cable route, bay position.

4. Scope and billing

Charger count, load management, OCPP back-office and billing model, written into the consent.

5. Approvals and install

Confirm required approvals, install and test the chargers, then hand over the agreed operating arrangements.

告诉我们您的需求,我们将定制最适合您的解决方案

您的企业有停车场吗?您可以通过停车场赚取额外收入。
为什么物业需要电动汽车充电器?

Does a private bay charger need approvals?

Requirements depend on the installation and intended use. Obtain management consent and have the electrical and approval requirements checked before work starts.

Will chargers overload the building's supply?

Load management lets chargers share the available power; the load study shows what's available before anything is installed.

How long does it take?

We confirm timing after assessing the site, scope and required approvals.

Do shared chargers need a licence?

Shared or publicly accessible charging can require additional approvals. EvGuru reviews the operating model and confirms the applicable process for your site.

Does the JMB have to pay upfront?

Purchase or partnership options depend on site suitability and agreed commercial terms.

What if our JMB says no?

Ask for the reasons in writing. A proposal can address available power, cable routing, metering and safety so the committee can assess the options.

现在寻求建议

给我们发信息
我们会尽快回复您。

感谢提交!

bottom of page