top of page

Penyelesaian Pengecasan EV untuk Tempat Letak Kereta & Perniagaan

Penyelesaian pintar, fleksibel dan boleh dipercayai untuk semua tempat letak kereta di pusat beli-belah, menara pejabat, kondominium di Malaysia

AT A GLANCE

 

Timeline

Confirmed after site assessment

 

Funding

Purchase or site-specific partnership

 

Requirements

Reviewed for your site

 

Billing

App or RFID options

 

THE BASICS

How condo charging works

Who pays

The building can purchase the chargers or discuss a partnership. Funding and revenue-sharing options depend on site suitability and agreed commercial terms.

Who has access

The property decides, and sees revenue and power usage in the CMS.

How residents pay

Monthly subscription or per-use charges set by the property, via the EvGuru app or RFID card.

Power

Dynamic load management lets several chargers share the building's supply; a phased 7kW plus load-management path stays within existing headroom where possible.

OUR PROJECTS

Residences we've equipped

Explore examples of EvGuru charging installations at residential properties. We can discuss a relevant installation and the options for your building during a site assessment.

Rimbun @ Embassy Row

 

Shared condo EV charging, profit share.

Two shared EvGuru charging bays for residents.

e6d781_a670c26461194a31a2b4d97720fc4f5b~mv2.jpg
e6d781_968082207ea1406e9f50f33fbecd9ae7~mv2.jpg

Four Seasons Residence, KLCC

 

Residential EV charging.

2 × 22kW chargers.

Surian Condo, Petaling Jaya

 

Condo EV charging.

2 × 22kW chargers.

TWO OPTIONS

Penyelesaian pengecasan yang direka untuk tempat letak kereta, pangsapuri dan pusat beli-belah

Sama ada harta tanah anda telah ditugaskan, tidak ditugaskan atau tempat letak kereta tetamu, penyelesaian fleksibel daripada EvGuru memudahkan anda menawarkan pengecasan EV.

Shared chargers for the building

 

Shared bays for residents or visitors, with access and billing agreed by management. EvGuru reviews site suitability and the approvals needed for the proposed operating model.

Private charger, own bay

 

A charger for a resident’s own bay starts with management consent and a site assessment. Electrical capacity, cable routing and applicable requirements are checked before installation.

CHECKLIST

What your building manager will ask for

Charger and load

 

Charger type and load; single-line diagram.

Building supply

 

Riser / transformer load study; cable route and trunking.

Billing and safety

 

Metering or billing method; RCD Type B protection.

Cover and credentials

 

Insurance and indemnity; ST-certified installer credentials.

STEP BY STEP

Cara EV GURU Berfungsi untuk Pengecasan Komuniti

1. JMB decision

 

Committee resolution and an EV by-law. We provide a one-page board paper and a draft by-law.

2. Feasibility pack

 

Credentials, single-line diagram, load study, insurance, plus a free 15-minute committee briefing.

3. Site survey

 

Joint walk with the building’s M&E team: DB capacity, cable route, bay position.

4. Scope and billing

 

Charger count, load management, OCPP back-office and billing model, written into the consent.

5. Approvals and install

 

Confirm required approvals, install and test the chargers, then hand over the agreed operating arrangements.

Beritahu kami keperluan anda dan kami akan menyesuaikan penyelesaian yang paling sesuai dengan anda

FAQ

Adakah Perniagaan Anda Mempunyai Tempat Letak Kereta? Anda Boleh Menjana Pendapatan Tambahan dengan Tempat Letak Kereta Anda.
Mengapa Hartanah Memerlukan Pengecas EV?

Does a private bay charger need approvals?

 

Requirements depend on the installation and intended use. Obtain management consent and have the electrical and approval requirements checked before work starts.

Will chargers overload the building's supply?

 

Load management lets chargers share the available power; the load study shows what's available before anything is installed.

How long does it take?

 

We confirm timing after assessing the site, scope and required approvals.

Do shared chargers need a licence?

 

Shared or publicly accessible charging can require additional approvals. EvGuru reviews the operating model and confirms the applicable process for your site.

Does the JMB have to pay upfront?

 

Purchase or partnership options depend on site suitability and agreed commercial terms.

What if our JMB says no?

 

Ask for the reasons in writing. A proposal can address available power, cable routing, metering and safety so the committee can assess the options.

Minta nasihat sekarang

Hantar mesej kepada kami
dan kami akan menghubungi anda sebentar lagi.

Terima kasih kerana menghantar!

bottom of page